No action taken by the Secretary under the authority under subsection (a) shall be subject to review in any Federal court.
The term “special exclusion action” means an action to prohibit, for a period not to exceed two years, the award of any contracts or subcontracts by the Administration or any other component of the Department of Energy related to any covered system to a source the Secretary determines to represent a supply chain risk.
The term “supply chain risk” means the risk that an adversary may sabotage, maliciously introduce unwanted function, or otherwise subvert the design, integrity, manufacturing, production, distribution, installation, operation, or maintenance of a covered system or covered item of supply so as to surveil, deny, disrupt, or otherwise degrade the function, use, or operation of the system or item of supply.